Research Article
A New Multicriteria Decision-Making Method for the Selection of Sponge City Schemes with Shapley–Choquet Aggregation Operators
Table 1
Each scheme and related technical contents.
| Technical index | Scheme | Scheme A | Scheme B | Scheme C |
| Sponge city project construction scheme | Sand base penetrates gully cover | The flood control of vegetation | Ecologically permeable concrete | Sand foundation through gutter kerb stone | Ceramic permeable brick | Permeable square | Sand base permeable brick | Colored asphalt pavement | Green roof | Ecological rain garden | Porous pavement | Ecological parking lot | Silica sand self-absorbent rod | Rain water abandoning device | Grass furrow | Honeycomb structure well body | Rainwater filter | Retention pond | Permeable impervious brick | Water storage module | Underground reservoir | Permeable and sand proof | Waterproof membrane | Constructed wetlands | Osmotic filtration wellbore | Elevator pump | Rainwater recycling | Miniature sprinkler irrigation system | Rainwater purification all-in-one machine | Constructed wetland sewage treatment technology | Constructed wetland sewage treatment technology | Miniature sprinkler irrigation system | Circulating water car washing system | Use of road flushing | Spool shaft seat | | Waste water flushing toilet | | | Cost input (ten thousand yuan) | 1986.2 | 1563.6 | 2155.4 | Project duration (month | 7.2 | 5.6 | 4.6 | Operation and maintenance cost (ten thousand yuan/year) | 34.75 | 17.46 | 27.93 |
|
|