A New Multicriteria Decision-Making Method for the Selection of Sponge City Schemes with Shapley–Choquet Aggregation Operators

Table 1

Each scheme and related technical contents.

Technical indexScheme
Scheme AScheme BScheme C

Sponge city project construction schemeSand base penetrates gully coverThe flood control of vegetationEcologically permeable concrete
Sand foundation through gutter kerb stoneCeramic permeable brickPermeable square
Sand base permeable brickColored asphalt pavementGreen roof
Ecological rain gardenPorous pavementEcological parking lot
Silica sand self-absorbent rodRain water abandoning deviceGrass furrow
Honeycomb structure well bodyRainwater filterRetention pond
Permeable impervious brickWater storage moduleUnderground reservoir
Permeable and sand proofWaterproof membraneConstructed wetlands
Osmotic filtration wellboreElevator pumpRainwater recycling
Miniature sprinkler irrigation systemRainwater purification all-in-one machineConstructed wetland sewage treatment technology
Constructed wetland sewage treatment technologyMiniature sprinkler irrigation systemCirculating water car washing system
Use of road flushingSpool shaft seat
Waste water flushing toilet
Cost input (ten thousand yuan)1986.21563.62155.4
Project duration (month7.25.64.6
Operation and maintenance cost (ten thousand yuan/year)34.7517.4627.93