| Decision-making level | First-level indexes | Second-level indexes | Expert weight | | | |
| Best project scheme | Engineering indicators C1 | Cost input C11 | [0.2, 0.5] | [0.4, 0.6] | [0.2, 0.3] | Project duration C12 | [0.1, 0.4] | [0.3, 0.5] | [0.1, 0.4] | Operational costs C13 | [0.3, 0.5] | [0.2, 0.3] | [0.2, 0.4] | Flood storage capacity C2 | Water retention capacity C21 | [0.2, 0.4] | [0.1, 0.3] | [0.3, 0.5] | Flood control of vegetation C22 | [0.3, 0.5] | [0.2, 0.3] | [0.1, 0.3] | Urban water network connection C23 | [0.2, 0.3] | [0.4, 0.5] | [0.2, 0.4] | Use of canals, rivers, and lakes C24 | [0.3, 0.6] | [0.2, 0.4] | [0.5, 0.6] | Ecological environmentC3 | Biological water purification C31 | [0.2, 0.5] | [0.4, 0.5] | [0.5, 0.6] | Soil protection C32 | [0.2, 0.5] | [0.4, 0.5] | [0.4, 0.5] | Wetland utilization C33 | [0.3, 0.5] | [0.4, 0.6] | [0.2, 0.4] | Rainwater collection and utilization C4 | Water-holding capacity C41 | [0.1, 0.4] | [0.2, 0.4] | [0.2, 0.5] | Water circulation C42 | [0.3, 0.5] | [0.2, 0.4] | [0.1, 0.5] | Rainwater collection C43 | [0.4, 0.5] | [0.3, 0.5] | [0.2, 0.4] |
|
|