Research Article

A New Multicriteria Decision-Making Method for the Selection of Sponge City Schemes with Shapley–Choquet Aggregation Operators

Table 5

Expert weight interval value.

Decision-making levelFirst-level indexesSecond-level indexesExpert weight

Best project schemeEngineering indicators C1Cost input C11[0.2, 0.5][0.4, 0.6][0.2, 0.3]
Project duration C12[0.1, 0.4][0.3, 0.5][0.1, 0.4]
Operational costs C13[0.3, 0.5][0.2, 0.3][0.2, 0.4]
Flood storage capacity C2Water retention capacity C21[0.2, 0.4][0.1, 0.3][0.3, 0.5]
Flood control of vegetation C22[0.3, 0.5][0.2, 0.3][0.1, 0.3]
Urban water network connection C23[0.2, 0.3][0.4, 0.5][0.2, 0.4]
Use of canals, rivers, and lakes C24[0.3, 0.6][0.2, 0.4][0.5, 0.6]
Ecological environmentC3Biological water purification C31[0.2, 0.5][0.4, 0.5][0.5, 0.6]
Soil protection C32[0.2, 0.5][0.4, 0.5][0.4, 0.5]
Wetland utilization C33[0.3, 0.5][0.4, 0.6][0.2, 0.4]
Rainwater collection and utilization C4Water-holding capacity C41[0.1, 0.4][0.2, 0.4][0.2, 0.5]
Water circulation C42[0.3, 0.5][0.2, 0.4][0.1, 0.5]
Rainwater collection C43[0.4, 0.5][0.3, 0.5][0.2, 0.4]