Journals
Publish with us
Publishing partnerships
About us
Blog
Mathematical Problems in Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Mathematical Problems in Engineering
/
2021
/
Article
/
Tab 2
/
Research Article
A Dynamic Intersecting Arrangement Model Based on Isolated Draw Zones for Stope Structure Optimization during Sublevel Caving Mining
Table 2
Experimental schemes.
Number
Name
Sublevel height (m)
Drift spacing (m)
1
Original
18
20
2
Intersecting model
22.5
20.5
3
Tangent model
22.5
22.5