Research Article
Production Scheduling Optimization of Prefabricated Building Components Based on DDE Algorithm
Table 6
Comparison of running results.
| Algorithm | Optimal minimum cost | Worst minimum cost | Average minimum cost | Standard deviation |
| LSS-DDE | 2626.7 | 2636.2 | 2633.6 | 2.995 | TRAD-DDE | 2682.4 | 2714.9 | 2700.5 | 9.849 | ACO | 2869.5 | 2908.1 | 2892.8 | 13.208 | PSO | 2852.3 | 2881.5 | 2868.2 | 10.230 |
|
|