Research Article

Production Scheduling Optimization of Prefabricated Building Components Based on DDE Algorithm

Table 6

Comparison of running results.

AlgorithmOptimal minimum costWorst minimum costAverage minimum costStandard deviation

LSS-DDE2626.72636.22633.62.995
TRAD-DDE2682.42714.92700.59.849
ACO2869.52908.12892.813.208
PSO2852.32881.52868.210.230