Research Article
Distributed Load Shedding considering the Multicriteria Decision-Making Based on the Application of the Analytic Hierarchy Process
Table 3
The results of generator outage case study.
| | Generator outage | Frequency after generator outage (Hz) | Frequency within the permissible range | Shed load (MW) |
| | WEBER69 | 59.97 | Yes | 0 | | JO345#1 | 59.56 | No | 38.57 | | JO345#2 | 59.56 | No | 38.57 | | SLACK345 | 59.62 | No | 13.89 | | LAUF69 | 59.86 | Yes | 0 | | BOB69 | 59.79 | Yes | 0 | | ROGER69 | 59.61 | No | 18.2 | | BLT138 | 59.70 | Yes | 0 |
|
|