Research Article
Innovative Control Technique for the Floor Heave in Goaf-Side Entry Retaining Based on Pressure Relief by Roof Cutting
Figure 11
Distribution of vertical stresses in different parts before and after roof cutting. (a) 5 to 20 m behind the working face, (b) 25 to 40 m behind the working face, and (c) 45 to 60 m behind the working face.
| (a) |
| (b) |
| (c) |