Research Article

Knowledge-Based Structure Optimization Design for Boom of Excavator

Table 4

Spearman rank correlation coefficient between X and σ.

ParametersXSTXHUXSDXRFXWTXLTXLOXBOXCOXSRXTTXHOXDO

σI−0.50.16−0.3−0.25−0.130.020.10.14−0.430.02−0.010.03−0.02
σII−0.130.74−0.04−0.11−0.170.120.170.10.03−0.13−0.04−0.060
σIII−0.160.470.05−0.130.050.250.08−0.2200−0.19−0.02−0.06
σV−0.160.33−0.16−0.08−0.49−0.040.020.16−0.31−0.01−0.08−0.050.07
σIV−0.230.27−0.26−0.54−0.010.110.060.14−0.260.03−0.1−0.050.05
σVI−0.510.25−0.07−0.050.030.20.080.130.08−0.330.040.13−0.08