Research Article
Hybrid Algorithm Based on Genetic Simulated Annealing Algorithm for Complex Multiproduct Scheduling Problem with Zero-Wait Constraint
Figure 11
The Gantt chart of Case 1. (a) The minimum makespan is 41, (b) the minimum makespan is 45, and (c) the minimum makespan is 46.
| (a) |
| (b) |
| (c) |