Journals
Publish with us
Publishing partnerships
About us
Blog
Mathematical Problems in Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Mathematical Problems in Engineering
/
2021
/
Article
/
Fig 15
/
Research Article
Hybrid Algorithm Based on Genetic Simulated Annealing Algorithm for Complex Multiproduct Scheduling Problem with Zero-Wait Constraint
Figure 15
The Gantt chart of Case 2. (a–f) The minimum makespan is 27.
(a)
(b)
(c)
(d)
(e)
(f)