Research Article
Short-Term Power Load Forecasting of Integrated Energy System Based on Attention-CNN-DBILSTM
Table 1
Correlation coefficient between electrical load and influencing factors.
| Correlation factors | Pearson coefficient absolute value | Correlation factors | Pearson coefficient absolute value |
| Time | 0.4792 | Electric load in the first 5 h | 0.6776 | Temperature | 0.3162 | Heat load in the first 5 h | 0.5068 | Radiation | 0.1074 | Gas load in the first 5 h | 0.2343 | Wind speed | 0.1998 | Electric load in the first 7 h | 0.6740 | Wind direction | 0.0226 | Heat load in the first 7 h | 0.5004 | Holidays | 0.3492 | Gas load in the first 7 h | 0.3126 | Electric load in the first 1 h | 0.8615 | Electric load in the first 9 h | 0.6565 | Heat load in the first 1 h | 0.4032 | Heat load in the first 9 h | 0.4775 | Gas load in the first 1 h | 0.3144 | Gas load in the first 9 h | 0.2010 | Electric load in the first 3 h | 0.7423 | Electric load in the first 11 h | 0.6768 | Heat load in the first 3 h | 0.5760 | Heat load in the first 11 h | 0.5138 | Gas load in the first 3 h | 0.2062 | Gas load in the first 11 h | 0.3359 |
|
|