Research Article
Operation Risk Structural Analysis and Evaluation System Construction for Multistation Integration Project
Figure 1
Operational performance early warning signals and risk drivers: (a) the value driver tree VDT; (b) analysis of operational risk sources.
(a) |
(b) |