Research Article
Operation Risk Structural Analysis and Evaluation System Construction for Multistation Integration Project
Table 11
Revenue data of each node in the training sample.
| Node | Node: n | Node (%) | Mean | Index (%) |
| 16 | 226.00 | 65.89 | 10.89 | 109.00 | 20 | 18.00 | 5.25 | 9.72 | 97.28 | 28 | 29.00 | 8.45 | 9.69 | 96.95 | 13 | 6.00 | 1.75 | 9.33 | 93.39 | 15 | 5.00 | 1.46 | 9.20 | 92.05 | 11 | 8.00 | 2.33 | 8.38 | 83.80 | 27 | 4.00 | 1.17 | 8.25 | 82.55 | 21 | 11.00 | 3.21 | 8.00 | 80.05 | 26 | 5.00 | 1.46 | 8.00 | 80.05 | 7 | 6.00 | 1.75 | 7.33 | 73.38 | 19 | 4.00 | 1.17 | 7.25 | 72.54 | 25 | 5.00 | 1.46 | 6.60 | 66.04 | 23 | 7.00 | 2.04 | 5.57 | 55.75 | 3 | 9.00 | 2.62 | 3.89 | 38.91 |
|
|