Research Article

The Research of the Overlapping Decentralized Guaranteed Cost Hybrid Control Method for Adjacent Buildings with Uncertain Parameters

Figure 12

Acceleration time-history curves of the top floor (ΔK = −0.15 K): (a) the left building; (b) the right building.
(a)
(b)