Research Article

Single-Phase Grounding Fault Identification Based on Transition Conductance Tracking Method

Figure 11

Instantaneous value of three-phase voltage in an ungrounded system. (a) RF = 500 Ω; (b) RF = 2,000 Ω; (c) RF = 4,000 Ω.
(a)
(b)
(c)