Table of analysis of hazard factors and risk reduction measures by basic causes of A001 alternative (Steps 7, 8, 9 of extended QFD-FMEA).

BCBC rateHazard factorsHF-CIComposition rateRate of HFAccident type (AT)Risk scoreRisk reduction measures (RRM)PriorityRisk reduction rate (RRR)Reduction cliticality index (RCI)

M10.17H_041.5026.4%4.6%A01_0115Risk reduction measure 0120.340.51
H_061.0017.6%3.0%A01_085Risk reduction measure 0250.520.52
H_081.6028.1%4.9%A01_0320Risk reduction measure 0310.520.83
H_121.3423.6%4.1%A01_026Risk reduction measure 0440.340.46
H_140.244.2%0.7%A01_072Risk reduction measure 0560.340.08
Sum5.68100%Sum2.40
M20.33H_038.5077.7%25.9%A01_02, A01_0620Risk reduction measure 0610.423.57
H_042.2220.3%6.8%A01_01, A01_0320Risk reduction measure 0710.531.18
H_080.222.0%0.7%A01_072Risk reduction measure 0860.340.08
Sum10.95100%Sum4.82
M30.33H_013.6033.2%11.0%A01_059Risk reduction measure 0930.381.37
H_030.222.0%0.7%A01_026Risk reduction measure 1040.380.08
H_041.6815.5%5.1%A01_0320Risk reduction measure 1110.400.67
H_051.009.2%3.0%A01_045Risk reduction measure 1250.340.34
H_084.3440.0%13.2%A01_01, A01_07, A01_0815Risk reduction measure 1320.522.25
Sum10.83100%Sum4.72
M40.16H_051.0018.7%3.0%A0act1_045Risk reduction measure 1450.340.34
H_124.3481.3%13.2%A01_02, A01_0320Risk reduction measure 1510.341.47
Sum5.336100%Sum1.81