Research Article

Systematic Approach of TOPSIS Decision-Making for Construction Method Based on Risk Reduction Feedback of Extended QFD-FMEA

Table 11

Analysis table of subjective beliefs about risk reduction and additional costs corresponding to steps 11 and 12 of extended QFD-FMEA at A001.

Risk reduction measures (RRM)Reduction measures prioritySafety efficiency (SE)Risk reduction rate (RRR)Increasing safety cost rate (ISCR) (%)
Education (SE1)Technology (SE2)Management (SE3)Personal (SE4)
0.70.50.40.3

Risk reduction measures 0120.90.10.340.01
Risk reduction measures 0250.90.10.521.10
Risk reduction measures 0310.90.10.520.10
Risk reduction measures 0440.90.10.340.15
Risk reduction measures 0560.90.10.340.30
Risk reduction measures 0610.50.40.10.420.10
Risk reduction measures 0710.80.10.10.530.20
Risk reduction measures 0860.90.10.340.80
Risk reduction measures 0930.80.20.380.80
Risk reduction measures 1040.70.20.10.380.30
Risk reduction measures 1110.70.20.10.400.40
Risk reduction measures 1250.90.10.340.10
Risk reduction measures 1320.90.10.521.00
Risk reduction measures 1450.90.10.340.05
Risk reduction measures 1510.90.10.340.50
Sum5.9