Research Article

Systematic Approach of TOPSIS Decision-Making for Construction Method Based on Risk Reduction Feedback of Extended QFD-FMEA

Table 15

Table of analysis of hazard factors and risk reduction measures by basic causes of A004 alternative (Step 7, 8, and 9 of extended QFD-FMEA).

BCBC rateHazard factorsHF-CIComposition rateRate of HFAccident type (AT)Risk scoreRisk reduction measures (RRM)PriorityRisk reduction rate (RRR)Reduction cliticality index (RCI)

M10.32H_010.485.2%1.7%A01_018Risk reduction measure 0130.460.22
H_03665.2%21.1%A01_0415Risk reduction measure 0220.563.36
H_052.2424.3%7.9%A01_0520Risk reduction measure 0310.641.43
H_120.485.2%1.7%A01_0210Risk reduction measure 0420.620.30
Sum9.2100%Sum5.31
M20.39H_040.65.3%2.1%A01_0210Risk reduction measure 0520.620.37
H_053.3629.9%11.8%A01_0520Risk reduction measure 0610.662.22
H_073.74433.4%13.2%A01_01, A01_036Risk reduction measure 0740.652.43
H_121.1210.0%3.9%A01_0210Risk reduction measure 0820.500.56
H_142.421.4%8.5%A01_0520Risk reduction measure 0910.621.49
Sum11.22100%Sum7.07
M30.15H_010.4811.0%1.7%A01_018Risk reduction measure 1030.680.33
H_040.613.7%2.1%A01_0210Risk reduction measure 1120.520.31
H_070.89620.5%3.2%A01_018Risk reduction measure 1230.620.56
H_082.454.8%8.5%A01_0612Risk reduction measure 1330.601.44
Sum4.38100%Sum2.63
M40.12H_012.466.7%8.5%A01_0612Risk reduction measure 1430.681.63
H_101.233.3%4.2%A01_0210Risk reduction measure 1520.620.74
Sum3.60100%Sum2.38