Research Article

Systematic Approach of TOPSIS Decision-Making for Construction Method Based on Risk Reduction Feedback of Extended QFD-FMEA

Table 16

Analysis table of subjective beliefs about risk reduction and additional costs corresponding to Steps 11 and 12 of extended QFD-FMEA at A004.

Risk reduction measures (RRM)Reduction measures prioritySafety efficiency (SE)Risk reduction rate (RRR)Increasing safety cost rate (ISCR) (%)
Education (SE1)Technology (SE2)Management (SE3)Personal (SE4)
0.70.50.40.3

Risk reduction measures 0130.40.40.20.460.10
Risk reduction measures 0220.50.40.10.562.10
Risk reduction measures 0310.60.40.640.10
Risk reduction measures 0420.20.80.620.30
Risk reduction measures 0520.20.80.620.90
Risk reduction measures 0610.20.80.660.10
Risk reduction measures 0740.50.50.650.70
Risk reduction measures 0820.50.50.51.60
Risk reduction measures 0910.20.80.622.10
Risk reduction measures 1030.20.80.681.20
Risk reduction measures 1120.30.60.10.520.40
Risk reduction measures 1230.20.80.622.10
Risk reduction measures 1330.50.50.63.10
Risk reduction measures 1430.20.80.680.20
Risk reduction measures 1520.20.80.621.40
Sum16.4