Research Article
Investment Risk Assessment of EPC Power Transmission and Transformation Projects under New Energy Grid Connection Based on the Owner’s Perspective
Table 6
Calculation data of index weights.
| Indicator | C11 | C12 | C13 | C14 | C21 | C22 | C23 | C31 | C32 | C33 | C41 | C42 | C43 |
| ej | 0.84 | 0.98 | 0.93 | 0.72 | 0.64 | 0.87 | 0.81 | 0.92 | 0.85 | 0.77 | 0.90 | 0.96 | 0.95 | | 0.09 | 0.01 | 0.04 | 0.15 | 0.19 | 0.07 | 0.10 | 0.04 | 0.08 | 0.12 | 0.06 | 0.02 | 0.03 |
|
|