Research Article
Analysis of Mechanical Performance of Double-Arch Biological Channel in the Operation Period considering the Effect of Fluid-Solid Coupling
Figure 8
Schematic diagram of on-site installation of vibrating wire equipment. (a) Piezometer. (b) Rebar stress meter. (c) Earth pressure cell. (d) Surface strain gauge.
(a) |
(b) |
(c) |
(d) |