Experimental Study on Calculation Method of Drainage Capacity of Drainage Facilities Affected by Overtopping on Artificial Island

Table 2

Overtopping results under different conditions (unit: 10−3 m3/(m.s)).

NoB (m)Section typeDesign schemeOptimization scheme
Elevation of CAP (m)OvertoppingElevation of CAP (m)Overtopping
Return period 100aReturn period 300aReturn period 100aReturn period 300a

K164.4M = 1.5 slope7.50.001.227.00.191.51
K240.07.51.8712.207.02.0117.03

K340.0Vertical structure7.86.9215.247.58.5127.07
K440.07.84.9113.107.510.9325.16
K540.07.81.866.297.510.1121.15
K640.07.81.344.207.53.039.72

K740.0M = 1.5 slope vertical structure7.52.537.197.53.129.18
K840.07.59.9024.077.511.9521.78
K940.07.03.7512.216.56.6020.95
K1045.07.03.0011.706.56.9025.01

K1140.0m = 1.5 slope7.56.4623.607.55.0322.99
K1240.07.52.6216.617.52.9816.59
K1340.07.51.628.777.52.219.05
K1440.07.51.649.727.51.9810.35
K1540.07.52.6611.207.53.2813.57
K1640.07.51.578.337.51.949.94
K1740.07.52.436.787.52.607.79
K1840.07.50.454.617.51.285.13
K1984.87.50.251.887.50.632.72