Research Article
Decision-Making with Risk under Interval Uncertainty Based on Area Metrics
Table 5
Risk decision information table of each scheme (natural state W1).
| Attribute | C1 | C2 | C3 | C4 |
| Scheme | a1 | [0.91, 1.21] | [0.88, 1.18] | [0.90, 1.01] | [0.87, 1.17] | a2 | [0.85, 1.09] | [1.06, 1.30] | [0.95, 1.04] | [0.81, 0.95] | a3 | [0.76, 0.93] | [0.71, 1.06] | [1.16, 1.30] | [1.05, 1.31] | a4 | [0.81, 1.41] | [0.77, 1.00] | [0.75, 0.85] | [0.75, 1.05] |
|
|