Research Article
Safety Assessment of Tunnel Shield Construction for Existing Adjacent Bridges
Table 3
Calculated vertical and differential settlement for each construction stage.
| Bearing platform number | Double-line construction completed | Vertical displacement (mm) | Differential settlement (mm) | Character space, L (m) | Differential settlement rate (‰) |
| P177 | 0.17 | 1.49 | 30.0 | 0.0496 | P178 | 1.66 | 0.65 | 40.0 | 0.0163 | P179 | 1.01 | 0.85 | 30.0 | 0.0283 | P180 | 0.16 |
|
|
Note. Vertical settlement is the value taken at the top surface of the central point of the bearing.
|