Research Article

[Retracted] Dynamic Control of Water Level in Flood Limited Reservoir Based on Intelligent Calculation

Table 2

Forecast precision of the IWHR.

No.Flood numberPeak flow (m3/s)Peak time error (length of time period)Magnanimity error (%)
RealForecastError (%)1 d magnanimity3 d magnanimity5 d magnanimity

1196908102028902724−0.6−1−1.0−6.0−10
21969081608109011082.0−13.03.0−5.0
319690819171560216035−2166.0−4.0
41973081208127313244.004.0118.0
519730820201900230922−412158.0
6197707292023741090−542−48−42−41
7197708022013551246−8.0−3−11−16−20
81978072605151515671.01−1.5−3.04.0
919780727052680305414−1−9.0−13−17
1019780807202420317131−2121.0−8.0
1119780825202310300930−322128.0
12198308040817401440−1709.028−27
13199407112394158596−91−6.00.0−5.0
141994081123197521529−813110.0
15199507282338204358141158.04.0
161995080120245028791800−2.0−5.0

Pass rate (%)70888888