Research Article

[Retracted] Dynamic Control of Water Level in Flood Limited Reservoir Based on Intelligent Calculation

Table 3

Forecast precision of HHU.

No.Flood numberPeak flow (m3/s)Peak time error (length of time period)Magnanimity error (%)
RealForecastError (%)1 d magnanimity3 d magnanimity5 d magnanimity

1196908102028902510−13.105.8−2.3−1.9
21969081608109011818.3−9−24.4−1.6−14.4
3196908191715601250−19.9312.38.62.3
419730812081273167131.3−10−39.5−69.3−76.0
519730820201900275745.12−18.6−17.7−15.5
6197707292023741200−49.5−533.737.034.2
7197708022013551159−14.5−019.317.016.9
81978072605151515671.01−1.5−3.04.0
9197807270526802322−13.4016.36.8−1.4
10197808072024202405−0.6013.015.812.8
1119780825202310332844.15−26.8−8.5−19.9
1219830804081740329189.11−76.8−96.1−97.5
13199407112394157824−16.9013.017.913.6
1419940811231975275639.59−32.5−2.1−14.3
151995072823382040816.8−1−24.7−3.9−4.7
1619950801202450275812.616.310.88.5

Pass rate (%)60608080