Research Article

[Retracted] Dynamic Control of Water Level in Flood Limited Reservoir Based on Intelligent Calculation

Table 4

Forecast precision evaluation of the IWHR.

No.Flood numberPeak flow (m3/s)Peak time error (length of time period)3 d flood volume/100 million m3
RealForecastError (%)RealForecastError (%)

198070224602070−15.9−23.343.22−3.6
298070621201920−9.402.292.321.3
3980714889101013.6−11.601.58−1.3
49807251420167017.602.202.241.8