Research Article

[Retracted] Dynamic Control of Water Level in Flood Limited Reservoir Based on Intelligent Calculation

Table 9

Water allocation ratio of Luanhe-Tianjin Water Diversion Project (108 m3).

Water supply guarantee rate (%)Water distribution ratio (%)
TianjinHebeiTotal

7551.348.7100