Research Article

A Stochastic Model for an Input Control Problem in a Two-Level Supply Chain for Production-Time-Dependent Products with Random Demands

Figure 4

Limiting distribution of Xi (k) with different Q and T. (a) Case 5 (loading = 0.75, T = 1, and Q = 50). (b) Case 6 (loading = 0.75, T = 2, and Q = 100). (c) Case 7 (loading = 0.9, T = 1, and Q = 50). (d) Case 8 (loading = 0.9, T = 2, and Q = 100).
(a)
(b)
(c)
(d)