Definition of model parameters.

NotationCorresponding meaning

The loading time of concrete mixing plant i
The moment of loading of the kth mixing truck dispatched from concrete mixing plant i to construction site j
The moment of departure of the kth mixing truck dispatched from concrete mixing plant i to construction site j
The moment of arrival of the kth mixing truck dispatched from concrete mixing plant i to construction site j
The moment when the kth mixing truck sent from concrete mixing plant i to construction site j starts pouring
The return moment of the kth mixing truck dispatched from concrete mixing plant i to construction site j
Transportation time from concrete mixing plant i to construction site j
The time required to return from construction site j to concrete mixing plant i
Waiting time of the kth vehicle dispatched from concrete mixing plant i to construction site j for unloading
Construction site waiting time for the mixing truck to deliver concretes
The unloading and pouring time of the mixing truck of concrete mixing plant i
The maximum transport time of the mixing truck that is acceptable for the construction site
The maximum time interval between two consecutive deliveries
The set of delivery depots
The set of mixing trucks