Research Article
Concrete Vehicle Scheduling Based on Immune Genetic Algorithm
Table 1
Definition of model parameters.
| Notation | Corresponding meaning |
| | The loading time of concrete mixing plant i | | The moment of loading of the kth mixing truck dispatched from concrete mixing plant i to construction site j | | The moment of departure of the kth mixing truck dispatched from concrete mixing plant i to construction site j | | The moment of arrival of the kth mixing truck dispatched from concrete mixing plant i to construction site j | | The moment when the kth mixing truck sent from concrete mixing plant i to construction site j starts pouring | | The return moment of the kth mixing truck dispatched from concrete mixing plant i to construction site j | | Transportation time from concrete mixing plant i to construction site j | | The time required to return from construction site j to concrete mixing plant i | | Waiting time of the kth vehicle dispatched from concrete mixing plant i to construction site j for unloading | | Construction site waiting time for the mixing truck to deliver concretes | | The unloading and pouring time of the mixing truck of concrete mixing plant i | | The maximum transport time of the mixing truck that is acceptable for the construction site | | The maximum time interval between two consecutive deliveries | | The set of delivery depots | | The set of mixing trucks |
|
|