Research Article

Optimization and Design of a Sustainable Industrial Grid System

Table 4

Total analysed estimation power demand.

Types of loadTotal power (kW)

i. Operating load2166.12
ii. Peak load2342.44
iii. Peak load + 10% of (i)2559.06