Research Article
Optimization and Design of a Sustainable Industrial Grid System
Table 8
Comparison of %THD for Design A and Design B.
| No | Industrial load | %THD | Design A | Design B |
| 1 | Process compressor | 1.92 | 1.40 | 2 | Conveyer motor | 2.11 | 1.50 | 3 | Lift | 2.11 | 1.51 | 4 | Welding system | 2.12 | 1.51 | 5 | Firewater Pumps | 2.13 | 1.53 | 6 | General lightings | 2.25 | 1.59 | 7 | UPS and HVAC | 2.31 | 1.65 | 8 | Air cond and sockets | 2.30 | 1.64 |
|
|