Research Article
Long-Term Bidding Scheduling of a Price-Maker Cascade Hydropower Station Based on Supply Function Equilibrium
Table 1
Installed capacities of the regional electricity market and their main parameters.
| Power station | Installed capacity (MW) | Maximum output (MW) | Minimum output (MW) | | |
| Hydropower station A1 | 1,386 | 1,386 | 0 | 0 | 60 | Hydropower station A2 | 640 | 640 | 0 | 0 | 60 | Coal-fired unit 1 | 1,000 | 1,000 | 100 | 0.102 | 179 | Coal-fired unit 2 | 1,000 | 1,000 | 100 | 0.104 | 185.3 | Coal-fired unit 3 | 600 | 600 | 50 | 0.208 | 191.6 | Coal-fired unit 4 | 600 | 600 | 50 | 0.212 | 196.2 | Coal-fired unit 5 | 300 | 300 | 50 | 0.432 | 206.7 | Gas-fired unit 6 | 600 | 600 | 50 | 0.448 | 268.6 | Run-of-the-river hydropower station group | 1,200 | 1,200 | 0 | 0 | 50 | Wind farm group | 214 | 214 | 0 | 0 | 30 | Photovoltaic power station group | 360 | 360 | 0 | 0 | 20 | Sum | 7,900 | | | | |
|
|