Research Article
Fuzzy Risk Assessment of Tunnels’ Undercrossing Existing Structures
Table 1
Risk grade classification of safety risk assessment index of the tunnel undercrossing the railway blasting construction.
| Risk level | Interval differentiate | Cloud digital eigenvalues |
| Low risk I | [0, 2) | (0.1, 0.3333, 0.0333) | Lower risk II | [2, 4) | (0.3, 0.3333, 0.0333) | Medium risk III | [4, 6) | (0.5, 0.3333, 0.0333) | High risk IV | [6, 8) | (0.7, 0.3333, 0.0333) | Extremely high risk V | [8, 10] | (0.9, 0.3333, 0.0333) |
|
|