Fuzzy Risk Assessment of Tunnels’ Undercrossing Existing Structures
Table 7
Risk assessment results of tunnel blasting construction.
| Evaluation methods | Evaluation of the results |
| Numerical calculation | Extremely high risk | One-dimensional cloud model | 100% probability (extremely high risk) | Two-dimensional cloud model | 0.4% probability (highly risky) and 99.96% probability (extremely high risk) | Cloud model soft ‘and’ computing | 82% probability (high risk) and 16% probability (extremely high risk) |
|
|