Research Article
An Improved PSO Algorithm for Optimized Material Scheduling in Emergency Relief
Table 4
Information on the demand for different materials at different relief points.
| ||||||||||||||||||||||||||||||||||||||||||||||||||
annotation: the range of the degree of life-threatening and non-substitutable levels of undersupply is [0ā10]. |