Research Article

An Improved PSO Algorithm for Optimized Material Scheduling in Emergency Relief

Table 4

Information on the demand for different materials at different relief points.

 Material requirements (tons)Inadequate supply of material life hazard levelDegree of material irreplaceabilityTightness factor

48351.0654
42351.0000
26571.1597
52571.4430
36761.5406
28761.4534

annotation: the range of the degree of life-threatening and non-substitutable levels of undersupply is [0–10].