Research Article
Performance Measurment and Lead-Time Reduction in EPC Project-Based Organizations: A Mathematical Modeling Approach
Table 4
Performance measuring tools.
| Attribute | Measure (importance of the attribute based on a 6-point Likert scale) |
| PERT/CPM | 1 = extremely low, 6 = extremely high | Rework | 1 = extremely low, 6 = extremely high | Credible schedule | 1 = extremely low, 6 = extremely high | Time as a measurement tool | 1 = extremely low, 6 = extremely high | Visibility of delay factors | 1 = extremely low, 6 = extremely high | Communication (MIS) | 1 = extremely low, 6 = extremely high |
|
|