Research Article
Optimum Selection of Mining Plans for Pillars Containing Interlayers Based on Numerical Simulation
Table 3
Maximum principal stress analysis results according to mining plan 1.
| | Mining panel | Stress concentration area | Maximum principal stress (MPa) | Pillar situation | | Before mining | After mining | Increment (MPa) | Increase (%) |
| | C | 4104 roof | −6.6 | −16.2 | −9.6 | 145 | Mined |
| | B | 4104 roof | −16.2 | −4.2 | 12 | 74 | Mined | | 4100 right pillar | −3.6 | −9.6 | −6 | 167 | Unmined |
| | D | 4110 left pillar | −8 | −3.6 | 4.4 | −55 | Mined | | 4109 left pillar | −9.6 | −3.9 | 5.7 | −59 | Mined |
| | A | 41–2 right pillar | −10 | −2.75 | 7.25 | −72.5 | Mined | | 4100 right pillar | −9.68 | −2.53 | 7.15 | −72.5 | Mined |
|
|