Optimum Selection of Mining Plans for Pillars Containing Interlayers Based on Numerical Simulation

Table 4

Minimum principal stress analysis results according to mining plan 2.

Mining panelStress concentration areaMinimum principal stress value (MPa)Pillar situation
Before miningAfter miningIncrementIncrease
(%)

A4101 roof−1.6201.62162Mined

B4101 roof−3.603.6100Mined
4105 left pillar−1.750.882.63150Unmined

C4108 roof−1.360.631.99146Mined
D4109 left pillar−20.22.2110Mined