Research Article

Optimum Selection of Mining Plans for Pillars Containing Interlayers Based on Numerical Simulation

Table 5

Maximum principal stress analysis results according to mining plan 2.

Mining panelStress concentration areaMaximum principal stress (MPa)Pillar situation
Before miningAfter miningIncrementIncrease (%)
(MPa)

A4101 roof−9.2−13.5−4.347Mined

B4101 roof−13.5−3.49.167Mined
4105 left pillar left−7.37−5.322.0528Unmined

C4108 left pillar left−8.65−4.753.945Unmined
4109 left pillar left−9.1−9.6−0.56Unmined

D4109 left pillar left−9.6−3.845.7660Mined
4109 right pillar−7.95−3.84.1552Mined