Maximum principal stress analysis results according to mining plan 2.
| | Mining panel | Stress concentration area | Maximum principal stress (MPa) | Pillar situation | | Before mining | After mining | Increment | Increase (%) | | (MPa) |
| | A | 4101 roof | −9.2 | −13.5 | −4.3 | 47 | Mined |
| | B | 4101 roof | −13.5 | −3.4 | 9.1 | 67 | Mined | | 4105 left pillar left | −7.37 | −5.32 | 2.05 | 28 | Unmined |
| | C | 4108 left pillar left | −8.65 | −4.75 | 3.9 | 45 | Unmined | | 4109 left pillar left | −9.1 | −9.6 | −0.5 | 6 | Unmined |
| | D | 4109 left pillar left | −9.6 | −3.84 | 5.76 | 60 | Mined | | 4109 right pillar | −7.95 | −3.8 | 4.15 | 52 | Mined |
|
|