Research Article
Method for Optimizing Energy Consumption in Machining Manufacturing Process
Table 3
Energy-saving production scheduling scheme obtained by weighing three optimization objectives under the existing production arrangement.
| Machining tasks | Selected process route | Machine tools selected for each process | Start processing time of each process, (s) |
| J1 | 1 | M1-M2-M5 | 92-221-1601 | J2 | 1 | M1-M2-M5 | 0-125-1428 | J3 | 1 | M1-M2-M5 | 165-312-1652 | J4 | 1 | M4-M4-M4-M4 | 1529-3587-3265-3391 | J5 | 1 | M4-M4-M4-M4 | 0-892-1625-3156 |
|
|