Method for Optimizing Energy Consumption in Machining Manufacturing Process

Table 3

Energy-saving production scheduling scheme obtained by weighing three optimization objectives under the existing production arrangement.

Machining tasksSelected process routeMachine tools selected for each processStart processing time of each process, (s)

J11M1-M2-M592-221-1601
J21M1-M2-M50-125-1428
J31M1-M2-M5165-312-1652
J41M4-M4-M4-M41529-3587-3265-3391
J51M4-M4-M4-M40-892-1625-3156