Research Article

Risk Priority Evaluation for Power Transformer Parts Based on Intuitionistic Fuzzy Preference Selection Index Method

Table 2

The initial evaluation information of the risk of parts.

PartsProbability of occurrenceSeverityDetectability
Expert 1Expert 2Expert 3Expert 1Expert 2Expert 3

Winding (A1)[0.35, 0.40]
Iron core (A2)[0.20, 0.30]
Bushing (A3)[0.05, 0.15]
Body (A4)[0.10, 0.15]
Non electric protection (A5)[0.01, 0.06]
Tap changer (A6)[0.10, 0.15]
Cooling system (A7)[0.01, 0.05]