Research Article
Multidepot Two-Echelon Vehicle Routing Problem for Earthwork Allocation Optimization
Figure 2
Schematic diagram of earthwork allocation (the dash lines indicate that the trucks have two options depending on their mileage limitation. They can either return to a replenishment center or head to a cutting field to reload).