Research Article

Long-Term Optimal Dispatching of Hydropower Station Based on Controlling the Frequency of Reservoir Level Fluctuation

Figure 9

Reservoir level optimization results with the water level fluctuation state of Manwan Hydropower Station changing at most 7 times.