Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
Table 1
Literature review of the HFS-SDST problem.
| Ref. | Problem | Setup type | Criterion | Approach |
| [6] | | SDF | Makespan; total tardiness | GA | [7] | | SD | Makespan; total completion time | Improved MH | [8] | | SD | Makespan; total tardiness | Improved SA | [9] | | SD | Makespan | Leaning IG | [10] | | SD | Total tardiness; total setup times | EA | [11] | | SD | The total weighted completion time | ABC | [12] | | SD | Total tardiness | An integrated approach based on ANN, GA, and CS | [13] | | Inner SD | Makespan | Regeneration GA | [14] | | SDF | PM cost; repair cost; tardiness | SA with GA | [15] | | SD | Makespan; total tardiness | Improved GA | [16] | | SD | Total tardiness | ACS | [17] | | SD | Makespan; tardiness | EA | [18] | | SDF | Total completion time | MA | [19] | | SD/MD | Makespan; the total weighted tardiness | Pareto approach | [20] | | SDF | Makespan | GA | [21] | | SD | Makespan | Improved GA | [22] | | SDF | Makespan; total weighted tardiness | Multipopulation GA | [23] | | SD | The sum of earliness and tardiness | Hybrid method based on AC and SA | [24] | | SDF | Makespan; total weighted tardiness | A multiphase approach | [25] | | SD | Total weighted tardiness | Electromagnetism algorithm | [26] | | SD | Makespan | Heuristics based on SPT, LPT, and Johnson | [27] | | SD | Makespan; total tardiness | SA | [28] | | SD/MD | Total completion time; the number of tardy jobs | Heuristics, SA, GA, TS | [29] | | SD | Makespan | IA | [30] | | SDF | Makespan | Heuristics | [31] | | SD | Makespan | Greed method; flow line method; NEH; GA | [32] | | SD | Makespan | Heuristics | [33] | | SD | Makespan | TS | [34] | | SDF | Makespan; total tardiness | Heuristics | [35] | | SD | Makespan | Hybrid algorithm on GA and TS | [36] | | SD | Makespan | B&B; TS; heuristics |
|
|