Research Article

Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times

Table 2

Parameter settings of the factors in the experimental design.

FactorsIndexLevels

Main factorProblem sizenk

Subplot factor1204
2506
31008
FlexibilityFm s
11/3 [2, 8]
22/3
31
Setup-to-processing time proportionS/P ()
15% [1, 5]
210% [1, 10]
325% [1, 25]
450% [1, 50]
575% [1, 75]
6100% [1, 100]
7125% [1, 125]
8150% [1, 150]
Algorithm1EPRA
2ESRA
3ESPRA