Specific overview of the expressway project.

Serial numberBasic informationValue

1Construction period24 months
2Road typeHighway
3Road classLevel 1
4Project budget302 million yuan
5Start and end station numberK32 + 200-K41 + 500
6Design width range (m)12.25–24.5
7Number of lanes
8One-way or two-wayTwo-way
9Quantity of earthwork excavation (10,000 m3)143.5
10Quantity of earth-filling and stonework (10,000 m3)135.4
11Design life100
12Pavement typeAsphalt road