Research Article
Intelligent Generation and Analysis of the Municipal Road Construction Scheme Based on the KNN Algorithm
Table 8
Comparison of characteristic parameters of similar road projects.
| Related information | This project | No. 26 | No. 20 | No. 7 |
| Case name | | | | | Similarity | — | 0.919 | 0.814 | 0.771 | Road class | High speed | High speed | High speed | High speed | Road length (km) | 6.12 | 6.126 | 9.51 | 5.802 | Bridge length (km) | 3.18 | 5.041 | 1.2 | 2.515 | Tunnel length (km) | 0 | 0 | 0 | 1.319 | Box culvert length (km) | 0 | 0.528 | 0.856 | 1.03 | Total excavation volume (10,000 m2) | 143.5 | 144.27 | 55.78 | 82.229 | Total excavation volume (10,000 m) | — | — | 19.541 | 64.876 | Total fill volume (10,000 m2) | 135.4 | 104.38 | 113.109 | 87.579 | Total volume of rock fill (10,000 m2) | — | — | 88.843 | 73.204 | Topography | Mountain | Mountain | Mountain | Hills | Natural division | V1 | V1 | V2 | V2 | Engineering geology | 0.35 | 0.45 | 0.55 | 0.5 | Total valid working days (days) | 450 | 600 | 500 | 600 |
|
|