Risk Decision-Making of Multiobjective Chaos Search in Construction Projects considering Loss Level and Probability Level

Table 2

Risk control effectiveness.

Risk nodesRisk loss expectationRisk control costs

Node 1NA0.4739 ± 0.157
Node 2NA0.5652 ± 0.148
Node 30.6213 ± 0.2690.6220 ± 0.169
Node 40.6349 ± 0.2530.6539 ± 0.165
Node 50.7365 ± 0.1830.8186 ± 0.129