Research Article

Prediction of the Normalized COVID-19 Epidemic Prevention Costs of Construction Projects Based on an Optimized Neural Network

Table 5

Error statistics of three methods (BP, BP neural networks optimized by GA, and the optimized neural network).

Data sequence numberActual valueBPError (%)BP neural networks optimized by GAError (%)The optimized neural networkError (%)

561019.271892.72%41.7735317.74%12.591925.92%
571268.1481467.90%12.13491.12%10.93858.85%
581239.9396232.83%49.9298316.08%13.530212.75%
591867.8152276.75%24.631736.84%20.069111.50%
60815.267490.84%60.9559661.95%7.011912.35%
6122.741837.09%2.16918.45%2.14967.48%

Average error199.69%223.70%13.14%