Research Article
Prediction of the Normalized COVID-19 Epidemic Prevention Costs of Construction Projects Based on an Optimized Neural Network
Table 6
Error statistics of three methods (RF, SVM, and the optimized neural network).
| Data sequence number | Actual value | RF | Error (%) | SVM | Error (%) | The optimized neural network | Error (%) |
| 56 | 10 | 25.1888 | 151.89% | 26.2675 | 162.68% | 12.5919 | 25.92% | 57 | 12 | 56.2222 | 368.52% | 27.1982 | 126.65% | 10.9385 | 8.85% | 58 | 12 | 42.1515 | 251.26% | 33.1918 | 176.60% | 13.5302 | 12.75% | 59 | 18 | 100.6665 | 459.26% | 81.8908 | 354.95% | 20.0691 | 11.50% | 60 | 8 | 13.7278 | 71.60% | 8.9750 | 12.19% | 7.0119 | 12.35% | 61 | 2 | 5.6393 | 181.97% | 7.0694 | 253.47% | 2.1496 | 7.48% |
| Average error | 247.42% | 181.09% | 13.14% |
|
|